Replace Existing Conveyor with New Conveyor onto Existing Bridge
KEY POINTS:
After installation of new conveyor it was discovered the current bridge could not handle the load. We were asked to design a new bridge and re-install new conveyor.
Installation of conveyor was done during shutdown.