Cargill

Tuscola, IL

Project Description: Dryer Addition
Summary of Project:
McC Inc installed the concrete foundation for the dryer and tower. We also tied into the existing system allowing grain to feed the dryer and return back into the grain elevator.  There was hot work required as well as scheduled shutdowns with the cilent to make this project run smoothly.
  1. Dryer Receiving
    1. (2) Conveyors rated at 15,000 bph.
    2. Catwalk/Conveyor bridge spanning over the dryer
    3. Switchback stairs accessing the dryer platforms
  2. Dryer Reclaim
    1. (2) Conveyors rated at 6,000 bph
  3. Miscellaneous
    1. Diverter valves & transitions to and from the existing grain elevator.